Facility decisions documented, spec by spec.
Every placement here started with a list of operational requirements. Power load, clearance height, truck access. The space came after.






Three placements. Three different operational briefs.
Precision components manufacturer, 8,400 sq ft
Steel fabrication unit, 14,000 sq ft
FMCG packaging unit, 5,200 sq ft
Required: crane-ready structure rated at 10T, 10 m clear height, heavy-vehicle road access, 250 kVA supply. Taloja MIDC shortlist of three sites assessed on-site.
Required: 3-phase 100 kVA supply, 7.5 m clear height, two loading bays. Sourced within Bhosari MIDC. Lease structured with a 3-year lock-in and expansion option.
Required: ground-floor access, four truck bays, potable water supply, 6 m clear height. Zoning compliance verified for food-adjacent production before shortlisting.
Outcome: purchase negotiated with a staged payment structure. Operations began ahead of the client's production deadline.
Outcome: operational fit confirmed before lease signing. Client relocated within 11 weeks of brief submission.
Outcome: lease term negotiated below initial ask. Production line commissioned within 60 days of handover.
4,000 – 20,000 sq ft
6+ MIDC Zones
Lease and Purchase
Placements completed across Bhosari, Ambernath, Taloja, Thane, Nashik, and Aurangabad industrial zones.
Engagements cover lease structuring, outright purchase negotiation, and expansion-ready site sourcing for manufacturing operations.
Facility sizes placed range from small-batch units to full-scale heavy industrial floors requiring crane infrastructure.
Bring us your facility requirements.
Power load, clearance height, truck bay count — the specifics are where we start. Tell us what your operation needs and we'll source against it.
