— Client Placements

Facility decisions documented, spec by spec.

Every placement here started with a list of operational requirements. Power load, clearance height, truck access. The space came after.

Wide interior shot of a light manufacturing floor, natural daylight through high clerestory windows, machinery stations arranged in rows, full floor-to-ceiling height visible, concrete floor with painted aisle markings
Wide interior shot of a light manufacturing floor, natural daylight through high clerestory windows, machinery stations arranged in rows, full floor-to-ceiling height visible, concrete floor with painted aisle markings
Loading dock interior, wide shot showing truck bay doors open, a forklift parked to the left, natural daylight flooding in from the dock opening, high ceiling with exposed steel trusses visible
Loading dock interior, wide shot showing truck bay doors open, a forklift parked to the left, natural daylight flooding in from the dock opening, high ceiling with exposed steel trusses visible
Heavy industrial facility interior, wide angle showing large gantry crane overhead, steel fabrication equipment on the floor, tungsten work-lighting illuminating the operational area, high structural ceiling with exposed I-beams
Heavy industrial facility interior, wide angle showing large gantry crane overhead, steel fabrication equipment on the floor, tungsten work-lighting illuminating the operational area, high structural ceiling with exposed I-beams
/ Documented Outcomes

Three placements. Three different operational briefs.

Light Manufacturing — Pune MIDC
Small-Batch Production — Ambernath MIDC
Heavy Industrial — Taloja MIDC

Precision components manufacturer, 8,400 sq ft

Steel fabrication unit, 14,000 sq ft

FMCG packaging unit, 5,200 sq ft

Required: crane-ready structure rated at 10T, 10 m clear height, heavy-vehicle road access, 250 kVA supply. Taloja MIDC shortlist of three sites assessed on-site.

Required: 3-phase 100 kVA supply, 7.5 m clear height, two loading bays. Sourced within Bhosari MIDC. Lease structured with a 3-year lock-in and expansion option.

Required: ground-floor access, four truck bays, potable water supply, 6 m clear height. Zoning compliance verified for food-adjacent production before shortlisting.

Outcome: purchase negotiated with a staged payment structure. Operations began ahead of the client's production deadline.

Outcome: operational fit confirmed before lease signing. Client relocated within 11 weeks of brief submission.

Outcome: lease term negotiated below initial ask. Production line commissioned within 60 days of handover.

4,000 – 20,000 sq ft

6+ MIDC Zones

Lease and Purchase

Placements completed across Bhosari, Ambernath, Taloja, Thane, Nashik, and Aurangabad industrial zones.

Engagements cover lease structuring, outright purchase negotiation, and expansion-ready site sourcing for manufacturing operations.

Facility sizes placed range from small-batch units to full-scale heavy industrial floors requiring crane infrastructure.

▸ Your Next Facility

Bring us your facility requirements.

Power load, clearance height, truck bay count — the specifics are where we start. Tell us what your operation needs and we'll source against it.